3344 City of Perris Statler Youth Center Renovation Project

BID DATE/TIME: February 16th, 2018 @ 12:00 pm

PROJECT: Statler Youth Center Renovation Project

OWNER: City of Perris

LOCATION: 120 N. Perris Blvd., Perris, CA 92570

-

SCOPE OF WORK & PLEASE READ THE SPECIFICATIONS CAREFULLY:

The Scope of work consists of the renovation of the interior, exterior, façade and site of the existing Statler building, including hardscape, landscape, the irrigation system, and decorative fencing to create Statler Youth Center and miscellaneous related improvements as required but the plans and specifications.

Please Note:

If your company is a MBE/DBE/DVBE please clearly mark this on your bid and provide your certification information with your bid.

The Schedule is 120 calendar days total!

MINIMUM AND PREVAILING WAGES: Notice is hereby given that the Contractor must comply with the State of California latest established wage decision.

-

NEW PUBLIC WORKS REGISTRATION REQUIREMENTS: All contractors and subcontractors shall not be qualified to bid on or be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Sections 1771.1(a) and 1725.5 More information may be found at:

http://www.dir.ca.gov/Public-Works/PublicWorks.html.

-

This project is a public project with prevailing wages and ALL contractors are required to comply with Labor Code 1777.5 and 1777.6. These labor codes also involve possible donations to an apprenticeship program. You may not be required to donate if your company is union. PLEASE BE SURE TO INCLUDE THESE IN YOUR BID!!! There is a per day penalty for underpayment of prevailing wages and/or overtime payments.

-

Thomco requires that all subcontractors issue certificates of insurance (general liability & worker’s compensation) naming Thomco Construction Inc. as additionally insured. For the worker’s compensation: a waiver of subrogation for the duration of the project is required. Please include the costs for obtaining these in your bid. If Subcontractor is performing Structural Steel Erection/Fabrication, the insurance amount must be $2,000,000 Aggregate/$1,000,000 Per Occurrence for bodily injury, personal injury, and property damage, plus an Excess Umbrella Liability policy in the amount of $5,000,000. NO INCREASE IN CONTRACT AMOUNT(S) WILL BE ISSUED AFTER BID FOR THESE CONDITIONS.

-

Thomco will be accepting proposal from the following trades.

q Demolition

q Site Clearing and Grubbing

q Earthwork and Grading

q Site Utilities

q Wrought Iron Fencing & Gates

q Landscape & Irrigation

q Concrete

q Masonry

q Metal Fabrication

q Structural Steel

q Rough Carpentry

q Millwork

q Fiberglass Reinforced Plastic Panels

q Building Insulation

q Clay Roof Tiles

q Flashing, Sheet Metal, Gutters & Downspouts

q Doors, Frames & Hardware

q Aluminum Storefront & Entrances

q Glass & Glazing

q Lath & Plaster (Stucco)

q Drywall

q Tile Work

q Acoustic Ceilings

q FRP

q Floor Covering & Base

q Anti-Graffiti Coating

q Painting

q Restroom Accessories

q Louvers and Vents

q Plumbing

q HAVC

q Electrical

-

 

Liquidated Damages: $500.00 per day

*** Schedule: 120 Calendar Days ***

Estimated Award of Contract: Within 120 days, Bid must remain valid for this duration!

** RFI’S DUE BY 2/12/18 @ 10:00 am**

Bids Due: 2/16/18 – Before 12:00 pm

-

 

Please direct any question regarding this bid to me via email.

We thank you in advance for your participation.

Louis Kloss

This e-mail address is being protected from spambots. You need JavaScript enabled to view it

-

CLICK HERE FOR REQURIED BID BREAKDOWN FORM

-

CLICK HERE FOR DRAWINGS

-

CLICK HERE FOR BID INFO & SPECIFICATIONS

-

CLICK HERE FOR ADDEDNUM No 1

 

 

 
Main Menu

Warning: Parameter 1 to modMainMenuHelper::buildXML() expected to be a reference, value given in /home/thomc0/public_html/libraries/joomla/cache/handler/callback.php on line 99
Key Concepts

Warning: Parameter 1 to modMainMenuHelper::buildXML() expected to be a reference, value given in /home/thomc0/public_html/libraries/joomla/cache/handler/callback.php on line 99