3335 New Bakersfield Base

SO CAL GAS BAKERSFIELD BASE – FORMAL BID INVITE

-

THOMCO Bid#3335

-

BID DATE/TIME: December 5th @ 10:00 am

PROJECT: New 10 Acre Site Development for a New Gas Co Bakersfield Field Base

OWNER: Southern California Gas Company

LOCATION: McMurtrey Ave., Bakersfield, CA 93308

-

-

THE SCOPE OF WORK IS: The Project is to develop a new Gas Co field base site in Bakersfield. This will be a mixed use site: field base, marketing office, public relations & energy efficiency center. Plans are being reviewed and completed but the general project information:

The subject property is a 10.335 acre parcel at McMurtrey Avenue. All of the proposed buildings are single story structures. The main building is to be approx. 29k sq. f.t., and is to be registered for LEED and WELL Certification. There is to be an outdoor community space, garage of approx. 3k sq. ft., a fueling area (fueling not in scope, however coordination with specialty contractor will be required, and grading of this area will be required), a storeroom building approx. 8k sq. ft. a covered storage area of approx. 10k sq. ft., enclosed by chain link fencing. There will be site work, including microwave tower & grading/gravel “area for future expansion”, a NGV fueling station, open to public (fueling not in scope, however coordination with specialty contractor will be required, and grading of this area will be required).

The owner would like to look at the options of cost & schedule for concrete tilt-up buildings vs. CMU buildings, so we will be seeking pricing and schedules for each type of construction.

SPECIAL NOTES: This project is a PRIVATE project with private wages to be paid. The RFP states that the Gas Company’s Payment Terms are to withhold 10% Retention and a NET 45. Please be advised and take note.

-

Thomco requires that all subcontractors issue certificates of insurance (general liability & worker’s compensation) naming Thomco Construction Inc. as additionally insured. For the worker’s compensation: a waiver of subrogation for the duration of the project is required. Please include the costs for obtaining these in your bid. If Subcontractor is performing Structural Steel Erection/Fabrication, the insurance amount must be $2,000,000 Aggregate/$1,000,000 Per Occurrence for bodily injury, personal injury, and property damage, plus an Excess Umbrella Liability policy in the amount of $5,000,000. NO INCREASE IN CONTRACT AMOUNT(S) WILL BE ISSUED AFTER BID FOR THESE CONDITIONS.

Penalties: $1,000.00 per day Liquidated Damages

*** Schedule TBD: Approximately 365 Calendar Days ***

Estimated Award of Contract: Within 120 days, Bid must remain valid for this duration!

** RFI’S DUE BY 11/27/17 @ 5:00 pm**

Bids Due: 12/5/17 – Before 10:00 am

-

Thomco will be accepting proposal from the following trades.


q Demolition

q Grading & Excavation

q Site Utilities

q Asphalt Paving & Striping

q Concrete (Structural & Site)

q Fencing & Gates

q Irrigation & Landscaping

q CMU Masonry (Buildings & Site Walls)

q Structural Steel

q Metal Fabrication

q Millwork

q Flashing / Sheet Metal

q Insulation

q Roofing

q Doors, Frames & Hardware

q Overhead Roll-up Doors

q Storefront Framing & Glazing

q Framing & Drywall

q Ceramic Tile

q Acoustic Ceilings

q Floor Covering

q Painting

q Restroom Partitions and Accessories

q Personnel Lockers

q Signage

q Projection Screens

q Operable Partitions

q Window Coverings

q Vehicle Lifts

q Fuel Tanks

q Overhead Fire Sprinklers

q Plumbing

q HVAC

q Electrical

q Fire Alarm

 

IF YOU ARE BIDDING MULTIPLE TRADES YOU WILL BE ASKED TO PLEASE BREAK OUT YOUR PRICES FOR EACH TRADE ON YOUR PROPOSAL

-

Please direct any question regarding this bid to me via email.

We thank you in advance for your participation.

Louis Kloss


 

 

This e-mail address is being protected from spambots. You need JavaScript enabled to view it

-

CLICK HERE FOR RFP

-

CLICK HERE FOR DRAWINGS

-

CLICK HERE FOR SPECIFICATIONS

-

CLICK HERE FOR SOILS REPORT

-

CLICK HERE FOR ADDENDUM  No. 1

-

CLICK HERE FOR ADDENDUM No. 2

-

CLICK HERE FOR ADDENDUM No. 3

-

CLICK HERE FOR ADDENDUM No 4

-

CLICK HERE FOR ADDENDUM No 4 Revised

-

CLICK HERE FOR ADDENDUM No 5